Forensic and structural engineers servingServing VIC, TAS, QLD, SA, NSW and the ACT

AS 2870-2011Residential slabs and footings

Abnormal Moisture Conditions

In brief

Abnormal moisture conditions under AS 2870-2011, with examples before, during and after construction: trees, drainage, leaks and watering.

Sara Khani

Written by

Sara Khani

Senior Forensic Structural Engineer

Standard

AS 2870-2011

Current edition, listed as Pending Revision by Standards Australia. Status checked November 2026

Published

22 November 2026

Revision A · Reading time 3 minutes

What are ‘Abnormal Moisture Conditions’ according to AS 2870-2011?

Abnormal moisture conditions are those that result in foundation moisture variations beyond those for normal sites. Abnormal moisture conditions can exist prior to construction or happen from the construction, or occur after construction.

Examples of abnormal moisture conditions existing prior to construction:

  • Removal of an existing building or structure likely to have significantly modified the soil moisture conditions under the footprint of the footing system of the building.
  • Removal of trees prior to construction.
  • Presence of trees on the building site or adjacent site.
  • Unusual moisture conditions caused by drains, channels, ponds, dams, swimming pools, effluent disposal areas or tanks, which are to be maintained or removed from the site.

Examples of abnormal moisture conditions resulting from construction:

  • Failure to provide adequate site drainage.
  • Failure to detail or construct drainage in accordance with AS 2870-2011.

Examples of abnormal moisture conditions developing after construction:

  • The effect of trees too close to a footing.
  • Excessive or irregular watering of gardens adjacent to the building.
  • Failure to maintain site drainage.
  • Failure to repair plumbing leaks.
  • Loss of vegetation from near the building.

What ‘Abnormal Moisture Conditions’ mean in plain English

Abnormal moisture conditions are situations where the moisture in the ground around a building’s foundation is different from what you’d normally expect. These conditions can be there before the building is even built, they can happen because of how the building is constructed, or they can develop after the building is finished.

Here are some examples:

Before Construction:

  • Taking down an old building or structure which might have changed how moist the soil is under the new building’s foundation.
  • Cutting down trees before starting to build.
  • Trees already present on or near the construction site.
  • Unusual wetness due to things like drains, ponds, pools, sewage areas, or tanks that are either going to stay or be removed from the site.
Sketch of a wrecking ball on a chain knocking down a brick building.
Taking down an old building on the site. Illustration: MFS Engineering.
Sketch of a chainsaw resting on cut tree logs beside a stump on cracked ground.
Trees cut down before building starts. Illustration: MFS Engineering.

During Construction:

  • Not making sure the site drains water properly.
  • Not following the AS 2870-2011 standards when planning or building the drainage.
Sketch of a house in heavy rain with water ponding in the ground around it.
Rainwater ponding around a house on a site that does not drain properly. Illustration: MFS Engineering.

After Construction:

  • Trees planted too close to the building’s foundation.
  • Over-watering gardens next to the building.
  • Not keeping up with the site’s drainage maintenance.
  • Not fixing leaks in plumbing.
  • Removing plants or trees near the building.
Sketch of a sprinkler spraying water over garden beds in front of a brick house.
Over-watering the garden next to the house. Illustration: MFS Engineering.
Sketch of a downpipe in heavy rain with water leaking from the pipe at its base into the soil beside the wall.
A leak at the base of a downpipe, soaking the soil beside the wall. Illustration: MFS Engineering.
Sketch of large trees close to a house, with one cut to a stump and a chainsaw cutting another.
Trees close to the house being cut down. Illustration: MFS Engineering.

From our investigations

Abnormal moisture does not always mean visibly wet ground. In our investigations, we encounter localised wetting from leaking pipes and poor drainage, as well as drying associated with nearby trees. Both can contribute to uneven movement in reactive foundation soils. We assess the distribution of damage, floor levels, drainage conditions, and the timing of plumbing repairs, tree removal or other site changes. Where necessary, targeted plumbing tests or geotechnical investigations help establish the source and extent of the problem. Cracking alone does not prove a moisture-related cause. Seek an engineering assessment where damage progresses, repeatedly returns, or develops alongside a suspected leak or significant change in site conditions.

References

  • Standards Australia, AS 2870-2011 Residential slabs and footings, Section 2 and Appendix B.
Sketch of a tilted house dripping water into a spreading puddle.

Unsure how this applies to your property?

Our forensic structural engineers inspect homes in Victoria, Tasmania, Queensland, South Australia, New South Wales and the ACT.

Related service: Forensic Structural Investigation

Talk to an engineer

Engineering record

Standard

AS 2870-2011

Residential slabs and footings

Current edition, listed as Pending Revision by Standards Australia. Status checked November 2026.

Clauses discussed

Section 2 and Appendix B

Prepared by

Sara Khani

Senior Forensic Structural Engineer

Revision

Rev A

Published 22 November 2026

Insight ref.

AS2870-03

Quote it when you contact us about this page.

Scope

This page explains the Standard in general terms. It is not an assessment of any particular property.

Revision history

A, 22 November 2026: first issue.

More Building Code Insights

Other Australian Standards and NCC requirements, explained by our engineers.

  • Sketch of a house beside a tree, with the soil cut away to show the tree's roots spreading under the house.
    AS 2870-2011

    Tree Distance from Buildings

    Safe planting distances for trees near a house under AS 2870-2011, based on soil reactivity and the tree’s mature height.

    22 Nov 2026 · Reading time 2 minutes

  • Sketch of a brick wall on the edge of a concrete slab, with the soil cut away to show the footing beneath.
    AS 2870-2011

    Surface Drainage Requirements for Concrete Slabs

    Fall away from the building and slab height above ground under AS 2870-2011 and NCC Housing Provisions 3.3.3, with each state’s NCC edition.

    22 Nov 2026 · Reading time 4 minutes

  • Sketch of a house outline with a gauge marked NCC inside, a tree, a downpipe, a stone path and a cut-away of the soil below.
    AS 2870-2011

    Normal Site

    How AS 2870-2011 defines a normal site: Class A, S, M, H1, H2 or E, moisture changes from climate, building, subdivision and normal gardens only.

    22 Nov 2026 · Reading time 2 minutes

View All Insights