Forensic and structural engineers servingServing VIC, TAS, QLD, SA, NSW and the ACT

AS 2870-2011Residential slabs and footings

Surface Drainage Requirements for Concrete Slabs

In brief

Fall away from the building and slab height above ground under AS 2870-2011 and NCC Housing Provisions 3.3.3, with each state’s NCC edition.

Sara Khani

Written by

Sara Khani

Senior Forensic Structural Engineer

Standard

AS 2870-2011

Current edition, listed as Pending Revision by Standards Australia. Status checked November 2026

Published

22 November 2026

Revision A · Reading time 4 minutes

Surface drainage requirements for concrete slabs according to AS 2870-2011 and NCC

AS 2870-2011: The site should be graded or drained so that water cannot pond against or near the building. The ground immediately adjacent to the building should be graded to a uniform fall of 50 mm minimum away from the building over the first metre. Surface drainage of the site shall be controlled from the start of site preparation and construction. The drainage system shall be completed by the finish of construction of the building.

NCC, ABCB Housing Provisions, clause 3.3.3:

The external finished surface surrounding the slab must be drained to move surface water away from the building and graded to give a slope of not less than

  • 25 mm over the first 1 m from the building in low rainfall intensity areas for surfaces that are reasonably impermeable such as concrete or clay paving; or
  • 25 mm over the first 1 m for any reasonably impermeable surface that forms part of an access path or ramp provided for Clauses 1.1(2) or (4)(c) of the ABCB Standard for Livable Housing Design; or
  • 50 mm over the first 1 m from the building in any other cases

The height of the slab above external finished surfaces must be not less than:

  • 100 mm above the finished ground level in low rainfall intensity areas or sandy, well drained areas; or
  • 50 mm above impermeable (paved or concreted areas) that slope away from the building in accordance with above; or
  • 150 mm in any other case.
Cutaway sketch of a house slab edge marked 50 mm above the paving outside, with the paving marked Fall 1 in 50.
Paved ground: slab at least 50 mm above paving that slopes away from the house. Illustration: MFS Engineering.
Cutaway sketch of a house slab edge marked 150 mm above the unpaved ground outside, with the ground marked Fall 1 in 50.
Unpaved ground: slab at least 150 mm above it (100 mm in low rainfall or sandy, well-drained areas). Illustration: MFS Engineering.
NCC edition for new houses, by state and territory, as of November 2026
State or territoryNCC edition in forceNext change
VictoriaNCC 2025, from 1 May 2026None announced
TasmaniaNCC 2022 (NCC 2025 applied from 1 May 2026; NCC 2022 was reinstated from 5 June 2026)NCC 2025 from 1 May 2027
QueenslandNCC 2022NCC 2025 from 1 May 2027
South AustraliaNCC 2022 Amendment 2NCC 2025 from 1 May 2027
New South WalesNCC 2022NCC 2025 from 1 May 2027
Australian Capital TerritoryNCC 2022 or NCC 2025, at the builder’s choice for new building approvalsNCC 2025 only, from 1 May 2027
Transition rules apply to work designed or approved before a change; confirm the edition with the project’s building surveyor. MFS Engineering works in Victoria, Tasmania, Queensland, South Australia, New South Wales and the ACT. Sources: Building and Plumbing Commission (Victoria); Building Standards Tasmania; Business Queensland; PlanSA; NSW Government; ACT Government. Links are in the references at the bottom of this page.

Surface drainage for concrete slabs in plain English

Here’s a simplified explanation of the drainage requirements for concrete slabs as per AS 2870-2011 and the NCC (National Construction Code), ABCB Housing Provisions, clause 3.3.3:

AS 2870-2011:

  • The site must be designed to prevent water pooling near buildings. This involves grading the ground immediately adjacent to buildings to slope away, with a minimum fall of 50 mm across the first metre.
  • Surface drainage needs to be a consideration from the onset of site preparation and throughout construction, with the system being fully operational upon the completion of the building.

NCC, ABCB Housing Provisions, clause 3.3.3:

  • The external surface surrounding a slab must be angled to direct surface water away from the structure. The required slope varies:
    • A minimum of 25 mm over the first metre from the building only where both apply: the area has low rainfall intensity, and the surface is reasonably impermeable, such as concrete or clay paving.
    • A minimum of 50 mm over the first metre from the building in all other scenarios.
  • The elevation of the slab relative to the surrounding ground should also be considered:
    • It should be at least 100 mm above ground level in areas with low rainfall or well-drained soils.
    • It should be at least 50 mm above impermeable areas that slope away from the structure as per the specified gradients.
    • In all other cases, the slab should be at least 150 mm above the external finished surfaces.

These guidelines ensure proper water drainage away from structures to maintain their integrity and prevent moisture-related issues.

References

  • Standards Australia, AS 2870-2011 Residential slabs and footings, Section 2 and Appendix B.
  • Australian Building Codes Board, National Construction Code, ABCB Housing Provisions, Part 3.3, clause 3.3.3 (NCC 2025 and NCC 2022).
  • Building and Plumbing Commission (Victoria), Understanding standards and regulations. bpc.vic.gov.au
  • Building Standards Tasmania, National Construction Code (NCC) 2026. buildingstandards.tas.gov.au
  • Business Queensland, Delayed adoption of the NCC. business.qld.gov.au
  • PlanSA, NCC 2025 state updates. plan.sa.gov.au
  • NSW Government, NSW to adopt new National Construction Code in May 2027. nsw.gov.au
  • ACT Government, National Construction Code adoption to support homeowners and industry. cmtedd.act.gov.au

The National Construction Code 2022 and the National Construction Code 2025 were provided by the Australian Building Codes Board under the CC BY 4.0 licence.

Sketch of a brick wall on the edge of a concrete slab, with the soil cut away to show the footing beneath.

Unsure how this applies to your property?

Our forensic structural engineers inspect homes in Victoria, Tasmania, Queensland, South Australia, New South Wales and the ACT.

Related service: Building Code Compliance Evaluation

Talk to an engineer

Engineering record

Standard

AS 2870-2011

Residential slabs and footings

Current edition, listed as Pending Revision by Standards Australia. Status checked November 2026.

Clauses discussed

Section 2 and Appendix B

Related NCC provision

ABCB Housing Provisions, clause 3.3.3

Prepared by

Sara Khani

Senior Forensic Structural Engineer

Revision

Rev A

Published 22 November 2026

Insight ref.

AS2870-05

Quote it when you contact us about this page.

Scope

This page explains the Standard in general terms. It is not an assessment of any particular property.

Revision history

A, 22 November 2026: first issue.

More Building Code Insights

Other Australian Standards and NCC requirements, explained by our engineers.

  • Sketch of a house beside a tree, with the soil cut away to show the tree's roots spreading under the house.
    AS 2870-2011

    Tree Distance from Buildings

    Safe planting distances for trees near a house under AS 2870-2011, based on soil reactivity and the tree’s mature height.

    22 Nov 2026 · Reading time 2 minutes

  • Sketch of a tilted house dripping water into a spreading puddle.
    AS 2870-2011

    Abnormal Moisture Conditions

    Abnormal moisture conditions under AS 2870-2011, with examples before, during and after construction: trees, drainage, leaks and watering.

    22 Nov 2026 · Reading time 3 minutes

  • Sketch of a house outline with a gauge marked NCC inside, a tree, a downpipe, a stone path and a cut-away of the soil below.
    AS 2870-2011

    Normal Site

    How AS 2870-2011 defines a normal site: Class A, S, M, H1, H2 or E, moisture changes from climate, building, subdivision and normal gardens only.

    22 Nov 2026 · Reading time 2 minutes