Surface drainage requirements for concrete slabs according to AS 2870-2011 and NCC
AS 2870-2011: The site should be graded or drained so that water cannot pond against or near the building. The ground immediately adjacent to the building should be graded to a uniform fall of 50 mm minimum away from the building over the first metre. Surface drainage of the site shall be controlled from the start of site preparation and construction. The drainage system shall be completed by the finish of construction of the building.
NCC, ABCB Housing Provisions, clause 3.3.3:
The external finished surface surrounding the slab must be drained to move surface water away from the building and graded to give a slope of not less than
- 25 mm over the first 1 m from the building in low rainfall intensity areas for surfaces that are reasonably impermeable such as concrete or clay paving; or
- 25 mm over the first 1 m for any reasonably impermeable surface that forms part of an access path or ramp provided for Clauses 1.1(2) or (4)(c) of the ABCB Standard for Livable Housing Design; or
- 50 mm over the first 1 m from the building in any other cases
The height of the slab above external finished surfaces must be not less than:
- 100 mm above the finished ground level in low rainfall intensity areas or sandy, well drained areas; or
- 50 mm above impermeable (paved or concreted areas) that slope away from the building in accordance with above; or
- 150 mm in any other case.


| State or territory | NCC edition in force | Next change |
|---|---|---|
| Victoria | NCC 2025, from 1 May 2026 | None announced |
| Tasmania | NCC 2022 (NCC 2025 applied from 1 May 2026; NCC 2022 was reinstated from 5 June 2026) | NCC 2025 from 1 May 2027 |
| Queensland | NCC 2022 | NCC 2025 from 1 May 2027 |
| South Australia | NCC 2022 Amendment 2 | NCC 2025 from 1 May 2027 |
| New South Wales | NCC 2022 | NCC 2025 from 1 May 2027 |
| Australian Capital Territory | NCC 2022 or NCC 2025, at the builder’s choice for new building approvals | NCC 2025 only, from 1 May 2027 |
Surface drainage for concrete slabs in plain English
Here’s a simplified explanation of the drainage requirements for concrete slabs as per AS 2870-2011 and the NCC (National Construction Code), ABCB Housing Provisions, clause 3.3.3:
AS 2870-2011:
- The site must be designed to prevent water pooling near buildings. This involves grading the ground immediately adjacent to buildings to slope away, with a minimum fall of 50 mm across the first metre.
- Surface drainage needs to be a consideration from the onset of site preparation and throughout construction, with the system being fully operational upon the completion of the building.
NCC, ABCB Housing Provisions, clause 3.3.3:
- The external surface surrounding a slab must be angled to direct surface water away from the structure. The required slope varies:
- A minimum of 25 mm over the first metre from the building only where both apply: the area has low rainfall intensity, and the surface is reasonably impermeable, such as concrete or clay paving.
- A minimum of 50 mm over the first metre from the building in all other scenarios.
- The elevation of the slab relative to the surrounding ground should also be considered:
- It should be at least 100 mm above ground level in areas with low rainfall or well-drained soils.
- It should be at least 50 mm above impermeable areas that slope away from the structure as per the specified gradients.
- In all other cases, the slab should be at least 150 mm above the external finished surfaces.
These guidelines ensure proper water drainage away from structures to maintain their integrity and prevent moisture-related issues.
References
- Standards Australia, AS 2870-2011 Residential slabs and footings, Section 2 and Appendix B.
- Australian Building Codes Board, National Construction Code, ABCB Housing Provisions, Part 3.3, clause 3.3.3 (NCC 2025 and NCC 2022).
- Building and Plumbing Commission (Victoria), Understanding standards and regulations. bpc.vic.gov.au
- Building Standards Tasmania, National Construction Code (NCC) 2026. buildingstandards.tas.gov.au
- Business Queensland, Delayed adoption of the NCC. business.qld.gov.au
- PlanSA, NCC 2025 state updates. plan.sa.gov.au
- NSW Government, NSW to adopt new National Construction Code in May 2027. nsw.gov.au
- ACT Government, National Construction Code adoption to support homeowners and industry. cmtedd.act.gov.au
The National Construction Code 2022 and the National Construction Code 2025 were provided by the Australian Building Codes Board under the CC BY 4.0 licence.